Commercial Refrigeration Floating Pressure Controls Rebate

For Commercial, Industrial, and Agricultural Applications within Vera Water and Power’s service territory. Must comply with all applicable codes and regulations. Rebate not to exceed cost on invoice.

The commercial refrigeration floating pressure controls rebate form (PDF) is available for download.

Eligibility

  • Available for retrofits only.
  • This measure applies to multiplex refrigeration systems (i.e., compressors operating in parallel) only.
  • The measure unit is evaporator design load in MBH.
  • Implementation requires use of the BPA Refrigeration Controls Calculator, and the MBH in the submitted calculator must match the highlighted or circled MBH in the submitted refrigeration schedule. The end-user can apply for either the Floating Head Pressure Control Measure, the Floating Suction Pressure Control Measure, or both, as indicated in the calculator.
  • Floating Head Pressure Control:
    • Pre-condition – The minimum head pressure temperature set point must be fixed and have exceeded or been equal to 80 degrees Fahrenheit.
    • Post–condition – Minimum head pressure control set point must be 70 degrees Fahrenheit.
  • Floating Suction Pressure Control:
    • Pre–condition – The base case must be a fixed suction pressure or temperature set point, as noted in the calculator.
    • Post–condition – post-project suction pressure shall be enabled to float, as indicated in the BPA Refrigeration Controls Calculator, based on input from a temperature sensor in a critical case on the appropriate suction group.

Commercial Refrigeration Floating Pressure Controls Rebate

This field is for validation purposes and should be left unchanged.

Customer Information & Building Specifics

Your Vera Water and Power account number can be found on your billing statement
Customer Name
Installation street address(Required)
This is the physical location where the energy-efficient appliance was installed
Applicant mailing address
If the mailing address is different than the installation address
Building type
check one

Project Information

Project type
check one

Document Requirements

Use this checklist to help compile documents for submission. For all projects, provide a detailed invoice plus any project-specific back-up documentation listed below.
Equipment or contractor invoice showing
Refrigeration schedule
Completed BPA refrigeration controls calculator
Upload your required documentation.
Drop files here or
Max. file size: 512 MB.

    Rebate offer(s) may be changed or discontinued at any time. All warranties are offered through the manufacturer, not the utility, whether expressed or implied, regarding the product(s) listed above for any materials or labor associated with installation, maintenance, repair, or any energy savings associated with use. Rebate offer(s) apply to new product(s) only. Utility reserves the right to inspect installed product(s). Product(s) must meet all program criteria to qualify for rebate(s).